Electrotechnical laboratory equipment premises. Electrotechnical laboratories. Laboratory equipment placement options


Electrotechnical laboratory. High-voltage stationary laboratory for testing protective equipment and electrical equipment. LEIS

Requirements for the premises for the location of the laboratory.

1. The presence of a ground loop in the high-voltage compartment.
2. Electric input 380, V 15 A.
3. The presence of exhaust ventilation (if it is absent, it is possible to organize an exhaust into the window).
4. It is desirable to have water supply and sewerage outside the high-voltage compartment.
5. The layout of the placement of laboratory equipment in the Customer's premises is agreed upon at the stage of approval of the TT to the laboratory. Below are the possible options placement of the LEIS laboratory.

Laboratory equipment placement options

Option number 1.

1. Power Input Stand.

3. Test bench for voltage indicators
4. Stand for drying protective equipment
5. High voltage transformers
6. Door with interlocks to the high-voltage compartment
7. Electromagnetic protective shield
8. Table for spare parts (spare parts, tools, accessories)
9. Ground loop

Option number 2.

1. Stand for processing the results from a PC.
2. Door with interlocks to the high-voltage compartment.
3. Power input stand.
4. Stand for testing protective equipment made of dielectric rubber and tools.
5. Stand for drying protective equipment.
6. Fume hood with Tangent 3M device.
7. Fume hood with the device "SKAT-M100".
8. High-voltage transformer 15 kV.
9. High-voltage transformer 100 kV.
10. Test stand for insulating rods.
11. Rack h = 2m for storing tested protective equipment.
12. Power input 3 ph. 16 A.
13. Electromagnetic protective shield.

Option number 3.

1. Power Input Stand.
2. Test stand for protective equipment made of dielectric rubber and tools


5. Exhaust cabinet ШВ-01-МСК
6. Exhaust cabinet ШВ-01-МСК
7. High voltage transformer 15kV
8. High voltage transformer 50kV
9. Digital device for testing transformer oil AIM-90Ts
10. Installation for quality control of transformer oil AST-2M
11. Door with interlocks to the high-voltage compartment.

Option number 4.

1. Power Input Stand
2. Door with interlocks to the high-voltage compartment
3. Test stand for protective equipment made of dielectric rubber and tools
4. Stand for drying protective equipment
5. High voltage transformer 15 kV
6. High voltage transformer 50 kV
7. Test bench for insulating rods
8. Electromagnetic protective shield
9. Ground loop

Option number 5.

1. Power Input Stand
2. Test stand for protective equipment dielectric rubber and tool
3. Stand for drying protective equipment
4. Test stand for insulating rods
5. Table for spare parts (spare parts, tools, accessories)
6.-7. High voltage transformers 15 kV, 50 kV
8.-9.-.10. Fume hoods ШВ-01-МСК
11. Door with interlocks to the high-voltage compartment
12.-13. AIM-90Ts transformer oil testing device, AST-2M transformer oil testing device

This is a mandatory procedure for the consumer of electricity, which is controlled by the authorities " Federal Service for Environmental, Technological and Nuclear Supervision (ROSTEKHNADZOR) "and" The Ministry Russian Federation for civil defense, emergencies and elimination of consequences of natural disasters (EMERCOM of Russia) ". The frequency of such tests is regulated by PTEEP, PUE, "Interindustry rules on labor protection in retail"," GOST R 50571.28-2006 (IEC 60364-7-710: 2002) Electrical installations of medical premises "," Interindustry rules for labor protection during the operation of oil depots, fuel depots, stationary and mobile gas stations. "

    Electrical distribution networks of premises, protection devices, electrical installations, etc. in the premises
    without increased danger

    at least once every 3 years

    Fulfillment of technical conditions for the implementation of technological connection.

    Commissioning of an electrical installation.

    a) Accompanying a representative of cable networks for the implementation Technical conditions with the subsequent approval of the Act on the delimitation of balance sheet ownership and operational responsibility of the parties (ARBP);
    b) Collection permits in network companies OJSC "MOEsK" / OJSC "OEK";
    c) Registration of an application to call the state inspector of MTU Rostekhnadzor as well as obtaining an Inspection Certificate and a Permit for Admission to Operation of Electrical Installations
    d) Execution of the Power Supply Agreement for Mosenergosbyt OJSC.
    e) Voltage supply.
    a) Approval of documentation in grid companies of OJSC "MOEsK" / OJSC
    "OEC" at the stage of filing applications with the assignment of an individual tariff;
    b) Collection and preparation of documents for the subject and filing an application:
    from 15-150 kW, 150-670 kW over 670 kW over 8900 kW;
    c) Collection and preparation of documents for filing an application for Technological connection through the redistribution of power;

All work must be carried out by qualified specialists who have an appropriate level of electrical safety approval with the right to test equipment with increased voltage. And also the company must be certified by the authorities of ROSTEKHNADZOR. And we are ready to provide all the services of the Electrolaboratory, with high quality, quickly and at affordable prices.

Many people are interested in the functions of an electrical laboratory and its main tasks. Some people feel that using such a laboratory creates additional costs and provides little or no benefit. In fact, this is not the case, since the electrical measurement laboratory performs different tasks, which no enterprise can do without.

The main tasks of the electrical laboratory:

  • insulation resistance measurement;
  • checking the presence of a circuit between grounded installations and elements of a grounded installation (measurement of cable insulation resistance);
  • checking the coordination of the parameters of the "Phase-zero" circuit with the characteristics of the protection devices (checking the loop resistance, phase zero);
  • checking the resistance of grounding conductors and grounding devices (measurement of grounding resistance);
  • measurement of insulation resistance with a megohmmeter of cable lines;
  • comprehensive testing of electrical equipment;
  • checking the RCD performance in the event of leakage currents in the protected line (RCD measurement);
  • checking the functionality of circuit breakers.

One of the main services of our company is electrical measurement work. We carry out control and testing of electrical equipment and power grids of various capacities. With the help of modern equipment, insulation resistance measurements and phase zero loop measurements are carried out. The use of modern high-precision devices will make it possible to reliably and qualitatively determine the level of safety of electrical installations and the compliance of their operating parameters with current technical documents. Our laboratory works in accordance with all the requirements that are imposed by the inspection authorities. Today, all functioning electrical equipment must undergo mandatory testing, which includes measuring the grounding resistance, checking the coordination of the "Phase-zero" circuit parameters with the characteristics of the protection devices and measuring the insulation.

An important advantage of our company is its extensive experience in working with various enterprises and organizations. Therefore, the quality of electrical measuring work is at a very high level. All services, such as checking the insulation resistance or measuring the resistance of the ground loop, are delivered strictly on time. The laboratory for electrical measurements, which is used by our company, is registered with the relevant supervisory authorities. Thanks to this registration, our company can carry out electrical measuring work on electrical equipment, the power of which exceeds 10,000 V.

With the help of an electrical measurement laboratory, you can carry out different kinds measurements concerning the operation of electrical equipment:

  • Tests regulated by the energy supervision authorities.
  • Regular measurements necessary to prevent emergency situations and various technical problems.

After carrying out the measurements, the company's specialists give the customer a comprehensive report, which is used when checking the operation of electrical equipment. If, in the course of measuring the insulation resistance or other measurements, any violations or defects were detected, then our specialists will draw up a statement with these defective data. It is an important accompanying document when working with electrical installations.

One of the functions of an electrical laboratory is to measure insulation resistance in electrical wiring, electrical equipment and secondary circuits. Our equipment can work with circuits with a voltage of more than 1 kV. The main indicator used to determine the level of insulation reliability is the resistance in the insulation of the system. In addition, the phase zero loop is evaluated. All tests and measurements in our laboratory are carried out in accordance with certain requirements regulated by the supervisory authorities.

Mobile electrotechnical laboratories ETL, IEC of domestic production are assembled by specialists of JSC "Pergam-Engineering", equipped with equipment BAUR, Megger, Radiodetection. Designed for testing and diagnostics of electrical equipment of substations, switchgear and cable lines, measuring the insulation resistance of power and current transformers, high-voltage switches and relay protection. They are used to locate faults in cable lines using precise and preliminary location methods.

Mobile electrical laboratories MEK, ETL are manufactured on the basis of Mercedes Benz, Sprinter, Volkswagen LT35, Ford Transit, GAZ-27057, KAMAZ-43118, KAMAZ-43114, URAL-4320, GAZ-33081 cars. Laboratory van body frame structure(or from sandwich panels on a welded frame), thermally insulated, manufactured in a two-compartment design. In the decoration we use high-quality plastic that does not crack in the cold. The price of an electrical laboratory is calculated individually, depending on the equipment and chassis of the car.

Equipment and certification

Each electrical laboratory Pergam ™ is certified and registered with the traffic police. We will help you to obtain a certificate of registration of an electrical laboratory in Rostekhnadzor. We will train your specialists in the rules of work in electrical laboratories, we will teach you how to use the equipment correctly. Services: we provide service warranty and post-warranty maintenance of laboratories and equipment. Electrical laboratories are equipped in Europe and Russia.

Advantages of electrical laboratories PERGAM

  1. Simplicity and ease of use of both individual components and the electrical laboratory as a whole;
  2. Five degrees of safety against electric shock;
  3. A wide range of equipment makes it possible to assemble electrical laboratories at an optimal price / functionality ratio;
  4. The assembly of electrical laboratories is carried out both on the territory of Russia (Moscow and Nizhny Novgorod) and the CIS (Kiev), and on the territory of the equipment manufacturer (England, Austria and Switzerland);
  5. Fully Russified interface;
  6. Availability unique equipment for testing cable lines at ultra-low frequencies, which does not damage the insulation. The training of the customer's specialists is carried out both at the customer's territory and at the territory of the equipment manufacturer;
  7. Warranty and post-warranty service of laboratories. ETL mobile electrical laboratories are designed for testing and diagnostics of cable lines and substation equipment;
  8. Mobile diagnostic systems have prepared documents for registration with the traffic police and a vehicle type approval certificate.
  9. Laboratories allow measuring insulation resistance: measuring the insulation resistance of cable lines, measuring the total resistance of the "phase-zero" circuit, checking the circuit breakers and the presence of a circuit between ground electrodes and grounded elements, checking the ground loop, determining the specific soil resistance, etc.

TM-Electro Company is certified by FSUE STC "ENERGOBEZOPASNOST" and is a conformity assessment body

The price list is given for reference. The final price is influenced by the area of ​​the object and the distance. CALL NOW and get significant DISCOUNTS - our managers will individually calculate the cost of the services of an electrical laboratory for you! Can be ordered free consultation specialist and free on-site visit of an engineer.

Prices for acceptance and operational tests:

Object area (sq. M.)

Cost (RUB) RUB

Operational Acceptance - acceptance
up to 25

4 500

7 500

26-100

7 500

12 500

101-200

12 500

17 500

201-500

17 500

24 500

501-1200

24 500

37 500

1201-2000

37 500

44 950

ETL tests show the real state of the electrical installation, which allows the operation service to identify problem areas in a timely manner. Competently performed measurements are the key to trouble-free and trouble-free operation! Moreover, our prices are among the lowest in Moscow!

We will professionally carry out tests by a licensed electrical laboratory

Laboratory tests must be carried out after implementation, reconstruction or during the operation of the electrical installation.

The result of the tests and measurements carried out is recorded in the Protocols Technical report.

The technical report is drawn up in accordance with the current Norms and Rules.

The list of defects contains the main defects of the electrical installation to be eliminated. (PTEEP clause 1.7.2. And PTEEP clause 3.6.24.)

Timely elimination of defects and comments increases the reliability of the electrical installation and operational safety. Warns of remarks and prescriptions from regulatory authorities!

ETL TM-Electro guarantees:

  • Free departure for inspection and study of the object
  • Quick calculation of the cost of electrical work
  • Estimates for the day
  • Prices below market
  • Availability of all permits
  • Thermal imaging diagnostics of panel equipment - free of charge
  • To carry out the work, modern equipment is used with annual verification. High-quality performance of work within the agreed time frame.
  • Engineers with a permit to carry out measurement work
  • Experience of at least 10-15 years
  • Re-measurements discount up to 50%

The main tests are divided into:

  • Operational and acceptance
  • Lightning protection devices can be tested separately - usually performed annually before the start of the thunderstorm season and grounding resistance tests
  • In addition to tests, the Ministry of Emergency Situations and Rostekhnador can check the presence of a passport for a grounding device
  • Operational tests are performed once every 3 years (once a year at highly hazardous facilities)
  • Test frequency table
  • Acceptance tests are carried out after a new electrical installation or reconstruction of the power supply system

Prices for electrical work:

List of Technical Report Documentation (Performance Tests):

  1. Explanatory note
  2. Protocol No. 1. Presence of a circuit between the grounded electrical installation and the grounding elements of the installation
  3. Protocol No. 2. Measurement of insulation resistance of wires, cables
  4. Protocol No. 3. Checking the coordination of the "phase-zero" circuit parameters with the characteristics of the protection devices and the continuity of protective conductors
  5. List of defects

List of Technical Report Documentation (Acceptance Tests):

  1. List of technical documentation
  2. Object passport
  3. Test program
  4. Protocol No. 1. "Visual inspection"
  5. Protocol No. 2. "Protocol for the presence of a circuit between grounded electrical installations and elements of a grounded electrical installation"
  6. Protocol No. 3. "Protocol of resistance of insulation of wires, cables, windings of electrical machines and devices"
  7. Protocol No. 4. "Protocol for checking the coordination of the parameters of the" phase-zero "circuit with the characteristics of overcurrent protection devices"
  8. Protocol No. 5. "Protocol for checking automatic switches with voltage up to 1000 V"
  9. Protocol No. 6. "Protocol of inspection and testing of automatic circuit breakers controlled by residual current (RCD)"
  10. List of defects
  11. Conclusion

The TM-Electro company is presented on the portal of suppliers of the city of Moscow... The portal is intended for participants in the placement of government orders as part of the implementation of "small volume" purchases (clauses 14, 14.1, part 2, article 55 Federal law from July 21, 2005 94-FZ)

To conclude state contracts for work related to operational tests and acceptance tests, you must enter the section of the Offer. Enter the name of the company: TM-Electro.

Permitting documents:

  • "Certificate of registration of the electrical laboratory" No. 6428 dated 06/03/2016.
  • "Certificate of Attestation No. IL - 00021"
  • "Certificate of Conformity No. SMK.RU / 08/09 / -1658"
  • "Qualification certificate dated 15.005.2008, AA series, No. 0000035"

Certificate of registration of the electrical laboratory of the IC "TM-Electro" (PDF).

List of permitted species electrical laboratory tests and measurements:

  1. Checking the condition of the elements of the grounding devices of electrical installations
  2. Checking the presence of a circuit and measuring the resistance between grounding conductors and grounded conductors, grounded equipment (elements) and grounding conductors
  3. Earth resistivity measurement
  4. Measurement of resistance of grounding devices of all types. At the same time, the measurement establishes the compliance of the results with the requirements of the PUE
  5. Measurement of the "phase-zero" loop resistance in installations with voltage up to 1 kV with a dead-grounded neutral. Such measurement of resistance allows you to determine the possibility of operation of the protection device (differential circuit breaker or conventional circuit breaker) in the event of a single-phase short circuit. This check reveals possible errors in the power supply network, and in particular the stages of choosing switching equipment and cross-sections of cable lines
  6. Measurement of insulation resistance of cables, windings of electric motors, apparatus, secondary circuits and wiring, electrical equipment with voltage up to 1 kV. In this case, the measurement is carried out with a megohmmeter with a test voltage of 1000 or 2500 Depending on which part of the electrical installation is being checked at the moment
  7. The measured resistance should not exceed the values ​​specified in the relevant sections of the PUE. Checking the operation of protection with a power supply system with grounded insulated neutral. Inspection and testing of automatic installation machines for supply lines and RCDs
  8. Checking the operation of protection made by fuse-links in electrical installations up to 1 kV, calibration of fuse-links
  9. Checking circuit breakers in electrical networks with voltage up to 1 kV for current actuation
  10. Measurement of transient contacts and resistances of windings of electrical machines and transformers
  11. Measurement of DC resistance of windings of power transformers and oil circuit breakers
  12. Overvoltage testing of cable lines and electrical equipment with voltage up to 1 kV
  13. Testing and measuring the characteristics of voltage transformers and current transformers with voltage up to 1 kV
  14. Checking relay protection devices, automation and telemechanics
  15. Checking emergency lighting schemes
  16. Measurement of resistance to spreading current of a grounding device
  17. Checking lightning protection schemes
  18. Inspection and testing of power supplies

Electrolaboratory - the best prices for services in Moscow and Moscow region

One of the main conditions for the stable operation of the power supply system is its regular Maintenance and carrying out all the necessary electrical measurements. It is for these purposes that there is a mobile electrical measuring laboratory, which promptly and fully conducts all regulated regulatory documents acceptance and operational measurements. Under the term " mobile electrical laboratory»Should be understood as a company licensed to service and measure electrical equipment and power supply networks. Such mandatory checks include measuring the insulation resistance of cable lines, checking the performance of grounding and working grounding, buildings, etc.

The electrical laboratory (ETL) produces both one-time and periodic (determined by regulatory documents) target and complex tests grounding devices (including measuring the insulation resistance of wires, checking the continuity of the grounding circuit, checking the protection operation and measuring the resistance to spreading of the ground loop current) and lightning protection, ringing of cables, equipment and much more on a contractual basis.

Based on the test results, a standard protocol of the established sample is issued and, in the event of a malfunction, a defective statement is issued..

Electrical laboratory activities are 100% licensed

All necessary conformities, requirements and standards are observed. The devices used are verified and certified by the State Metrological Service.

We carry out personnel certification, training... Issuance of admission group up to IV inclusive. Including with an admission to laboratory tests.

In what cases it is necessary to carry out electrical measurements and tests of an electrical installation:

  • new and overhauled apartments
  • cottages, country houses, country houses and other buildings
  • garages, change houses or any other premises
  • input metering, often recommended by inspectors
  • transferring the meter in the apartment to another place or transferring the electrical panel from the floor to the dwelling
  • underfloor heating and various electrical equipment
  • obtaining additional capacity transferring the premises into a non-residential fund or property
  • fire safety considerations and more

Based on the test results of the electrical laboratory, a typical technical report is issued the established sample, consisting of the required amount protocols, depending on the characteristics of a particular object and, in case of detection of violations, - a defective statement. The frequency of tests is determined by regulatory documents.

Each protocol is stamped. At the end of the protocol, a conclusion is given. The technical report must be accompanied by an explanatory note, certified photocopies of the license and registration certificate. The modern plastic binding makes the report pleasant to look at, easy to handle and durable in storage.

A typical electrical laboratory protocol consists of:

  • title page, with the logo and details of the electrical control laboratory, indicating the name of the organization, the full address of the customer and the date of the measurements
  • an explanatory note detailing the method and course of measurements
  • the first protocol is visual inspection electrical installations for its compliance with the PUE, SNiPs and standards for electrical work
  • the second protocol is the presence of a metal connection - an uninterrupted circuit between equipment requiring grounding and the building's ground loop
  • the third protocol is the result of testing the insulation resistance of the tested wires and cables using a megohmmeter
  • the fourth protocol reflects the results of measuring the phase-zero loop, or the short-circuit current required for emergency operation of the electromagnetic or thermal splitter of the machine or the burnout of the fuse-link
  • the fifth protocol reflects the state and parameters of the ground loop, if you, of course, have it available
  • copy of the certificate of registration of the laboratory, approved for use

Each protocol is certified by the round seal of the electrical laboratory. At the end of the protocol, a conclusion is given. The modern plastic binding makes the report pleasant to look at, easy to handle and durable in storage.

All Technical reports are made in accordance with the PUE, PTEEP, Norms and Rules. Meet the requirements of Rostekhnadzor and the Ministry of Emergency Situations

Electrolaboratory TM-Electro will quickly and efficiently carry out electrical measurements

We will promptly answer all your questions, calculate the cost estimate. If you are planning an inspection, issued an order, the term of the Technical Report has expired. We will carry out acceptance, operational or preventive tests.

Electrical measurements are carried out by qualified personnel using modern electronic equipment passed annual verification.

Loop phase zero. From these protocols of the Technical Report, it is possible to determine Current state electrical installations. All measuring work is performed by the TM-Electro electrical laboratory only with a visit to the facility. If a shutdown is required, the shutdown schedule is agreed with the Customer.

TM-Electro does not issue a Technical Report without a visit... For more than 13 years of work, a huge practical experience has been accumulated in electrical measuring work (measurement of insulation resistance, measurement of a zero phase loop). Resistance measurement is one of the most requested protocols in the Technical Report.

With the help of digital devices, the integrity of the insulation of cable lines is checked. The readings of the devices are compared with the reference ones and are recorded in the report, in the form of a table. The table also indicates the marking of the cable lines and the cross-section. In the last column it is written - whether the insulation meets the standard or not.

In case of non-compliance, the remark is entered into the List of Defects and must be eliminated. Measuring the insulation resistance allows you to identify the problem before an emergency occurs.

Poor insulation is a leading cause of short circuits, fires and electric shock.

The photo below shows examples of dangerous situations with an electrician, from the practice of our ETL. Complete burnout of the insulation of the electric wire and the case of the circuit breaker (in a wooden house!).

Attention! Often, dangerous electrical faults cannot be identified by visual inspection.

Measurements are carried out in accordance with the test frequency table or at the request of the person responsible for the electrical equipment (after all, he is responsible for the safety of the facility). To measure resistance, the time-tested Sonel MIC 250 device is usually used. We will promptly answer all your questions and calculate the cost estimate.

We also work throughout Moscow and in the following cities of the Moscow region:

Balashikha, Khimki, Podolsk, Korolev, Lyubertsy, Mytishchi, Elektrostal, Zheleznodorozhny, Kolomna, Odintsovo, Krasnogorsk, Serpukhov, Orekhovo-Zuevo, Shchelkovo, Domodedovo, Zhukovsky, Sergiev Posad, Pushkino, Ramenskoe, Noginsk.